- Home
- Departments
- Engineering & Public Works
- Projects and RFP Out to Bid
Projects and RFPs Out to Bid
CLICK HERE for the Urbandale Bid Postings Portal
To view plan documents after a project has been let: Click the link above and toggle the "Show Closed Bids" box near the top of the page.
RFP’s/RFQ’s currently available:
- No RFPs at this time, thank you for checking!
Design RFP’s and RFQ’s are available in the Urbandale Bid Postings page (link above) under the Engineering Design Services category.
Plan Holders List
Bid Tabulations - Recent Lettings
- Bid Tab 156th Street Signals.pdf
- Bid Tab 2023 Patch Phase 1 PCC East
- Bid Tab 2023 Patch Phase 2 Roundabout
- Bid Tab 2023 Patch Phase 3 PCC West
- Bid Tab 2023-005 Aurora Avenue Preservation
- Bid Tab 2023-018 Looped Fiber
- Bid Tab 2023-024 Storm Sewer Intake Rehab
- Bid Tab 2022 Sidewalk Program
- Bid Tab 2023 ADA Improvements Plan
- Bid Tab 2023-010 Parkview Creek Trail Replacement
- Bid Tab Acadia Park
- Bid Tab 100th Culvert Demo
- Bid Tab North Walnut Creek Stabilization
- Bid Tab PV Solar Array
- Bid Tab Satellite Salt Storage
Bid Tabulations - Construction 2022 Bids
- Bid Tab 2022 Sanitary Sewer Spot Repair Program.pdf
- Bid Tab 2022 Sanitary Sewer Lining Program.pdf
- Bid Tab 2022-015 Sharon Heights Trail Repair
- Bid Tab 2022 Traffic Signal Improvements.pdf
- Bid Tab WCRP Trail SW Interior Loop.pdf
- Bid Tab - 2022 ADA Improvement Program
- Bid Tab PCC Patch Phase 2
- Bid Tab Douglas Plantings 2022-006
- Bid Tab Glen Eagles Trail Repair 2022-015
- Bid Tab Sylvan Ridge Trail Repair 2022-015
- Bid Tab 2021 Sidewalk Program
- Bid Tab Aurora-104th-100th Widening 2022-03
- Bid Tab Coyote Ridge Trail Phase 2
- Bid Tab PCC Patch Phase 1
- Bid Tab Storm Intake Rehab 2022-016
- Bid Tabulation - 2022 Battery Backup Project
Bid Tabulations - Past Years
- Bid Tab- Pedestrian Head Upgrade
- Bid Tabulation 2021 Sanitary Sewer Spot Repair Program
- Beaver Creek Bank Stabilization Bid Tab.pdf
- 2021 Sanitary Sewer Lining Program Bid Tab
- Urbandale City Hall HVAC Improvements Bid Tab
- Douglas Ave Urbanization - North Walnut Creek to 100th St Bid Tab
- 128th St Sidewalks Bid Tab
- 2021 HMA Project Bid Tabulation
- 2020 Stormwater Project Bid Tab
- Bid Tab FS 43 Masonry Repairs
- Bid Tabulation WCRP Park Shelter - East Side
- Bid Tab 2020 Sidewalk Program
- Bid Tab 2021 ADA Improvements
- Bid Tab Police Drainage Improvements
- Bid Tab 2021 Traffic Signal Improvements
- Bid Tab Coyote Ridge Trail Phase 1
- Bid Tabulation Cross Creek Drainage
- WCRP Community Open Space bid tab
- Murphy-Deer Ridge Bid tab
- Bid Tabulation 2021 Community Entrance Signs
- Bid Tabulation - Traffic Signal Controllers
- Bid Tab 2020-03 Waterford Road 142nd St to 156th St
- Bid Tab PCC Project Phase 1 West
- Bid Tab PCC Project Phase 2 East
- Bid Tab Storm Sewer Intakes
- Bid Tab - 2020 Fiber Project
- Bid Tab - Parks and Public Works Satellite Facility
- 2020 Sanitary Sewer Lining Program Bid Tab
- Bid Tabulation All-Inclusive Playground.pdf
- Bid Tab 2019-011 Community Entrance Signage.pdf
- Bid Tab WCRP Parking Lot 2020-009
- Bid Tabulation 2020 ADA Improvements
- Bid Tab 2020 Traffic Signal Improvements
- Bid Tabulation 2020 Patch Program Phase 2
- Bid Tabulation 2020 Patch Program Phase 1
- Bid Tabulation Restroom Improvements- Northview Park
- Bid Tabulation Storm Sewer Intake Rehabilitation Program
- Bid Tabulation 152nd Street Trail
- Bid Tabulation 2019 Sidewalk Program
- Bid Tab 112th St and Meredith Dr Signal
- Bid Tabulation - 6614 Boston Ave Acquisition and Demolition
- Bid Tabulation - Meredith Fiber Project
- Bid Tab 2019 Stormwater Project
- Bid Tab San Sewer Spot Repair Program
- Bid Tabulation - Stormwater Repair Project
- Bid Tab-2019-08-05-Douglas Avenue Frontage Road Right-In Right-Out Access
- Urbandale PPWMF - Bid Tab
- Bid Tabulation- 2019 Sanitary Sewer Lining Program
- Bid Tab Northpark Drive Trail 86th to 100th Street
- Bid Tab 2019-023 ADA Improvements
- Bid Tab 2019-022 Fire Station 41 Patching
- Bid Tabulation - 2019 Traffic Signal Improvements
- Bid Tab 2018 Sidewalk Repair Program
- Bid Tabulation- 86th Street Preservation Phase II
- Bid Tabulation- 2019 PCC Reconstruction Program
- Bid Tabulation - 2019 Storm Sewer Intakes
- Bid Tabulation-Meredith Drive, 156th to 170th Street
- Bid Tab - 104th Street Reconstruction Project
- Bid Tab-72nd Street Reconstruction Project
- Bid Tabulation- Northpark Water Main
- Urbandale Fire station 43 - Bid-Tab Final Results
- Bid Tabulation- 2018 Sanitary Sewer Spot Repair Program
- Bid Tabulation- 2018 Stormwater Project
- Bid Tabulation- 2018 Sanitary Sewer Lining Program
- Bid Tabulation - 2018 PCC Patch Phase 1
- Bid Tabulation - 2018 PCC Patch Phase 2
- Bid Tabulation- Bent Creek Ridge Trail
- Bid Tabulation - Battery Backup Project
- Bid Tabulation - Traffic Signal Improvements
- Bid Tabulation - Claiborne Circle Trail Replacement
- Bid Tabulation - Meredith Fiber Project
- Bid Tabulation - 2018 Storm Sewer Intakes
- Bid Tab- 2018 Concrete Purchase
- Bid Tab-2017 Sidewalk Repair Program
- Bid Tabulation - 86th St Retaining Wall
- Bid Tab- Waterford Rd, Aurora Ave Sidewalk, 170th St. Ditch
- Bid Tabulation - 75th Street and Douglas Ave Intersection Improvements
- Bid Tabulation - Douglas Parkway and 142nd Street Pavement Improvements
- Bid Tabulation - Douglas Ave Gateway Enhancements
- Bid Tabulation - 2017 Traffic Signals Improvement
- Bid Tab - Memorial Tree Park Trail Replacement
- Bid Tab 2016 Sidewalk Repair Program
-
Engineering
Physical Address
3600 86th Street
Urbandale, IA 50322
Phone: : 515-278-3950
-
Public Works
Physical Address
9401 Hickman Road
Urbandale, IA 50322
Phone: : 515-278-3950