170th Street Reconstruction

Project Description:

This project would provide for the reconstruction of 170th Street from Meredith Drive to Waterford Road as well as approximately 1/4 mile of Meredith Drive, east of 170th Street. Both roads will be reconstructed as a four-lane roadway with left-turn lanes, including grading and storm sewer.  170th Street will include the City’s Complete Street policy, with a 5’ sidewalk and 10’ separate bike lane along the west side of the road.  Meredith Drive will include a 10’ trail along the north side of the road.  This project has an anticipated bid letting date of mid-March through the Iowa DOT and has received a State Transportation Block Grant to assist with funding. Please check back for additional information after letting.